TRcompute

Computing infrastructure · Lithuania

GPU servers.
Supply & rental.

The hardware your project needs, with the details worked out. GPU server procurement, project-based rental and infrastructure planning.

Registered in Kaunas · IT office in DruskininkaiOperated by UAB Transrida InotechCompany details

Equipment & configuration

The whole system.
Every component considered.

Accelerators are one part of the specification. CPU, memory, storage, network and site requirements belong in the same discussion.

GPU servers
Hardware categories and specification details
GPU computeGPU model and count, memory per GPU, interconnect and chassis compatibility.
Server platformsProcessor, system memory, rack format, power and cooling requirements.
StorageWorking datasets, usable capacity, throughput and data protection requirements.
NetworkingNetwork interfaces, switches, cabling and links between compute nodes.

Final part numbers, availability, warranty and delivery terms are specified in the quotation.

Examples only — AI workstations, many other GPUs, servers and components are available on enquiry.

Project briefs

What a useful brief
looks like.

Two typical requirements show the information we use to develop a hardware or rental proposal.

01 / Supply brief

An inference server for an internal AI application.

A dedicated environment for an internal document assistant, with local model serving and integration into an existing company network.

Starting brief
1 GPU with 48 GB memory, 128 GB system RAM and 2 × 1.92 TB NVMe drives.
To validate
Model size and precision, concurrent users, response-time target and usable storage.
Proposal scope
Compatible server platform, exact components, delivery terms and applicable warranty.
Discuss a similar requirement
02 / Rental brief

A defined training window with dedicated GPU capacity.

Additional GPU capacity for a six-week fine-tuning study, with data preparation and evaluation remaining on existing infrastructure.

Starting brief
4 GPUs with 80 GB memory each, 512 GB system RAM and fast local working storage.
To validate
Framework, GPU topology, dataset transfer, training method and project start date.
Proposal scope
Available capacity, rental period, access method, location and support responsibilities.
Discuss a rental project

Working together

A clear path to procurement.

Agree the equipment and responsibilities before committing to an order.

01 / BRIEF

Start with the requirement.

Share your workload or equipment list, quantities, destination and target date. Attach a specification if you have one.

02 / PROPOSAL

Review the details.

Discuss the configuration, availability, price, warranty and delivery assumptions. Agree any installation or support scope separately.

03 / COORDINATION

Plan the delivery.

Confirm the order and handover requirements. Coordinate supply against the agreed terms and project responsibilities.

About TRcompute

A business you can
put a name to.

TRcompute is operated by UAB Transrida Inotech, registered in Kaunas, with an IT office and warehouse in Druskininkai, Lithuania. We work with technical and procurement teams on server supply, GPU rental enquiries and computing infrastructure planning.

About the company

Tell us what you need to run.

A specification, a workload or a short project brief is enough to start.

Send your requirements